This is where I'm at. Have to wait for the right size tap to come so I can finish gas line. Still have to insullate the doors so there is still some work to do plus, I wanna add a small shelf on either end to rest stuff on. This is my 3rd build and if there is anything you see wrong or where I can improve, I would greatly appreciate the feedback . https://photos.app.goo.gl/uf2fcPRAxzwemTv88
Hi Tom, Wow, some serious fitting with the firebrick. You're a professional brick layer? Looks good. What I want to put on mine a piece of 1" schedule 40 to act as a receiver. Then I can slide in a 3/4" support bar with adjustable in height and depth. Something to hold the re-bar out front. Dan
Hi Dan and thx for the reply. No, I'm not a bricklayer. I just like to build things and when I do, I like to make them to the best of my ability. The knife making thing will improve in time. I looked at your site and I can only hope to get it that good. You do beauty work. Have a gr. Xmass. Tom